The current delivery log should be :
- 4 production aircrafts used for trials : B301, B302, C101, M1
- 9 Rafale M F1 (tranche 1): M2 to M10 put in storage and waiting for their F3 upgrade.
- 48 Rafale F3 (Tranche 2, former F2) :
- 7 C (C102 to C108)
- 25 B (B303 to B327)
- 16 M (M11 to M26)
- 39 Rafale F3 (Tranche 3) :
- 22 C (C109 to C130)
- 11 B (B328 to B338)
- 6 M (M27 to M32)
Among those 100 fighters delivered so far, only 83 (19 M, 35 B and 29 C) are in operational service (3M and 1B lost, 9M in storage, 2B, 1C and 1M for trials)
No comments:
Post a Comment